Location Tikhuba school
Data of installation 3-5 May 2017
Average wind/sun production 118kw
Hybrid system connection Administration and PC room
Remote control of the systems from the technical office in Italy
The system provides an automatic switching to the grid when there maintenance is being done or when it’s necessary to update the system.